Our solution variety also covers locking assemblies (clamping components/locking gadget), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, common joint, rod ends and yokes. Fantastic consideration has been compensated on environmental safety and strength preserving. Our items are manufactured by modern computerized equipment and tools. Product introduction
Stainless Metal Branch Tee NPTF Thread SAEJ 514 StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd EPT Adapter(5604 Sequence)
EPTnical Assistance
QC EPTs engineering has the potential to style drawings conform to SAE, BS, JIS, DIN amp ISO specifications. And we can also make according to customers’ drawings or samples.
Connected EPT
EPT Take a look at Certificate(EN15714/3.1)
We can offer the MTR for every single shipment.
Generation Approach
Deal and EPT
Our Certification
QC EPTs has been granted ISO 9001:2015 amp SGS certificates for processing stainless metal EPT hose fittings and adapters.
Why Decide on Us?
one. Historical past:
QC EPTs is an ISO 9001:2015 accredited producer with more than twenty year’s manufacturing encounter, EPTTizing in EPT hose fittings and adapters. We only focus stainless metal content, no carbon steel or brass.
two. Product assortment, dependable good quality:
1. EPT EPT JCEPs
one). forty three Sequence CrEPTT EPT JCEPs/Couplings
two). HY Sequence CrEPTT EPT JCEPs/Couplings
3). BW Collection CrEPTT EPT JCEPs/Couplings
4). Stainless Steel EPT Ferrule For SAE 100R 1AT, 2AT EPT
5). Stainless Metal Female JIC seventy four Diploma Flare EPT JCEP
6). Stainless Metal Woman BSP 60 Degree Cone EPT JCEP
7). Stainless Metal BSP EPT sixty Diploma Cone Seat EPT JCEP
eight). Stainless Steel Feminine BSP 60 Degree Cone 90 Elbow EPT JCEP
9). Stainless Metal NPT EPT EPT JCEP
2. EPT Adaptors
1). NPT EPT Thread Adapters
two). O-ring Boss SAE/ORB Adapters
three). JIC 37 Degree Flare Adapters
four). NPEPT EPT Thread (woman swivel) Adapters
five). O-ring Confront Seal (ORFS) Adapters
six). BSPP/BSPT Adapters
3. Stainless DIN Metric EPT JCEPs
4. Stainless reusable hose fittings
5. Reduced pressure stainless steel push on hose ends and hose barbs
three. EPTT EPTT Of Raw EPT:
one. We only select the greatest quality stainless steel uncooked material. And steel suppliers provide substance take a look at certificates for each and every shipment.
two. We 100% evaluate the dimensions of bar inventory and forging blanks by callipers for each cargo.
3. We use the Moveable XRF Analyser to examination the crucial chemical elements of bar inventory and forging blanks with 10% for each cargo(Important chemical elements incEPTT Cr, Ni, Mo, these chemical components are really EPTTant for the corrosion performance)
four. Aside from, we randomly decide up several of cutting items to do more chemical evaluation by spectrograph every 10 daEPTTto make sure the raw substance one hundred% competent.
four. EPTT EPTT Of Generation Procedure:
1. We are using Sigma EPT-EPT CNC Lathe EPTTs to manufacture stainless steel hose fittings and adapters.
The functions of CNC Lathe EPTTs:
1). Twin-aXiHu (West EPT) Dis.s, EPT system
two). Thread chopping tools: EPT Japan, vargus amp carmex Israel(Have a extremely stable efficiency during machining)
two. We use callipers to measure the fundamental measurements. And we use the thread gages to examine the threads.
three. We use Contracer amp Contour Measuring EPTTs to examine the very modest angles and diameters.
5. Inspection:
1. 1st Post Inspection During Approach
1).The operator make the first article according to production drawings.
2). The operator will examine the initial report and record. If the measurements and threads fulfill the producing drawings, and then the first report will be place in a EPTT box( the box is for first write-up only).
3). Workshop foreman will get second inspection for the very first post.
4). Only passing the inspection by workshop foreman, and then start with mass generation.
two. Mass Generation Soon after 1st Write-up Inspection
one).Soon after the first report authorized by operator and workshop foreman, and then begin with mass creation.
two). During mass creation, the operator needs to inspect the threads every ten pieces, and evaluate the measurements every single 15 pieces. After any fittings of threads and proportions out of the specs, all this batch of fittings will be inspected completely.
3). The competent fittings will be fitly place in a plastic box piece by piece.
4). Lastly, the concluded fittings will be transported to inspection office for final inspection.
three. Ultimate Inspection
1). Appearance: one hundred% inspection unEPTTstrong gentle. No scratch, No burr.
2). Crucial measurements and angles: fifteen-20% randomly inspection by callipers and contracer. Once any sizes and angles of fittings out of specs or isn’t going to respect to drawings, this batch of fittings will be pressured to return again to generation workshop to improve or make a new alternative.
3).Threads: 15-twenty% randomly inspection by rigEPTT gages. When any threads out of specs or will not respect to drawings, this batch of fittings will be compelled to return back again to creation workshop to enhance or make a new substitute.
six. Soon after Support:
When consumers have any problems about our products, we will just take a swift action.
We can one hundred% make a new substitution for free of charge when the customer has a criticism about our items.
Our EPTT
FAQ
Q: Are you a buying and selling organization or manufacturer?
A: We are a one hundred% manufacturer, principal goods include stainless metal EPT hose fittings and stainless metal EPT adapters.
Q: Do you have inventory?
A: At present we manufactured to buy, but we do have some stocks for typical kind uncooked materials. So we can make a rapid action for some urgent orders.
Q: Do you have a MOQ ask for?
A: Usually our MOQ is two hundred items. But for some bigger sizes, fifty or a hundred parts is also acceptable for the initial purchase.
Q: How about your payment technique?
A: 30% deposit in EPT, the stability payment against the duplicate of Monthly bill of lading. Of course, I believe every thing is negotiable.
Q: What about your supply time?
A: About 45 daEPTTfor frequent orders. But it relies upon on the orEPTTvolume. Of course, if you have an urgent order, we will try out ideal to meet up with you.